Уважаемые пользователи Голос!
Сайт доступен в режиме «чтение» до сентября 2020 года. Операции с токенами Golos, Cyber можно проводить, используя альтернативные клиенты или через эксплорер Cyberway. Подробности здесь: https://golos.io/@goloscore/operacii-s-tokenami-golos-cyber-1594822432061
С уважением, команда “Голос”
GOLOS
RU
EN
UA
nikolaylalilalay
6 лет назад

4NEW — CLEAN GREEN ENERGY FOR CRYPTO MINING


4NEW Limited is the world's first public waste utility waste treatment plant. 4NEW will revolutionize the Waste and Energy industry by offering services as a wholesaler in the Utilities sector that is fully integrated into open source, decentralized public exchanges that allow consumers and industry associates to trade their 4NEW Coins for payments in the 4NEW ecosystem. 4NEW's products are based on need, solve two social problems, waste surplus and energy shortage. The 4NEW blockchain platform will be built on an underlying maintenance infrastructure that covers the entire supply chain from waste collection to power generation to selling energy units to the national network or between consumers and industry associates.

Mission 4NEW

Our mission is to provide integrated, scalable, localized, localized integrated solutions for Waste to Energy conversion with real-time feedback to our customers. By integrating the Waste to Energy supply chain into the blockchain network, we create economies of scale and transparency given to end consumers resulting in savings and confidence while remaining accountable.

PROBLEM

  • WASTE: We throw 2.12 billion tonnes of global waste each year, growing 3% annually - this means we will double our waste production in 25 years.
  • ENERGY: The world's energy supply of about 80 percent depends on fossil fuel energy. The IEA predicts a 50-60% rise in global energy demand, and a 50% increase in greenhouse gas emissions by 2030.
  • CRYPTO: The growth of crypto-mining energy consumption is exponential. As of March 31, 2018, 1 Bitcoin transaction spends as much as 30.5 US households during the day, this is a 500% increase since September 2017.

SOLUTION

  • WASTE: Each of our factories takes 50,000-100,000 tons of waste annually, processing it with environmentally friendly methods, to create electricity. Gate costs offset plant operating costs, allowing for free electricity production.
  • ENERGY: The electricity we produce is constant, year-round, and can be adapted to any location by human activity. Electricity is sold to national networks or applied to operate mining processes at on-site mining quarries.
  • CRYPTO: 4NEW is the world's first eco-friendly environmental blockchain ecosystem driven by waste to power plants. 4New ecosystem will provide a blockchain platform that will allow decentralized, peer-to-peer transactions where energy production can directly meet global energy consumption.

Token Details:

The KWATT token is based on the ERC-20 token standard and Ethereum-powered smart contracts. Once the blockchain is developed, the token will be swapped out for the KWATT coin which will interact with the blockchain. The total token offering is three hundred million tokens (300,000,000). This is the hard cap limit for the crowd sale offering. Each KWATT Coin represents 1 kilowatt of electricity per year.

Token FRNC
Price 1 FRNC = 2 USD
Platform Ethereum
Accepting ETH
Soft Cap Achieved!
Hard Cap: 75 M.

  • June 23 - July 6: 50% Bonus
  • July 7 - July 20: 30% Bonus
  • July 21 - August 10 25% Bonus

ROADMAP

  • DEC 2015
    Plant 1
    Construction Begins

  • SEP 2016
    Plant 2
    Construction Begins

  • MAR 2017
    Plant 1
    Complete

  • OCT 2017
    Plant 2
    Complete

  • OCT 2017
    Pre-Sale
    Round 1 Launch of KWATT

  • NOV 2017
    Closing the Pre-Sale
    Round 1

  • DEC 2017
    Closing the Pre-Sale
    Round 2

  • 2ND QUARTER 2018
    Initiate planning on 3rd plant site
    Complete setup and initiate operations of first mining rigs onsite
    Launch power plant integration with mining rigs
    Complete KYC and 4new blockchain development and integration

  • 3RD QUARTER 2018
    Rigs with functional capacity of power plant

  • 4TH QUARTER 2018
    Initiate scale up logistics of power output and performance of mining rigs onsite, achieving full plant capacity

  • 1ST QUARTER 2019
    Initiate build out of 3rd facility and global expansion plan.

Project Team & Advisor:

For more information you can visit the link:
Website: https://4new.io
Whitepaper: https://4new.io/wp-content/uploads/2018/05/4New_WhitePaper_English.pdf
Telegram Group: https://t.me/FRNCoin
Twitter: https://twitter.com/4newcoin
Facebook: https://www.facebook.com/4newcoin/
ANN: https://bitcointalk.org/index.php?topic=2364696.0
My btt profile link: https://bitcointalk.org/index.php?action=profile;u=1706864

0
0.000 GOLOS
На Golos с March 2018
Комментарии (3)
Сортировать по:
Сначала старые